From seymour at snf.stanford.edu Tue Jan 22 01:31:41 2002 From: seymour at snf.stanford.edu (seymour at snf.stanford.edu) Date: Jan 22, 2002 1:31:41 PM Subject: Shutdown tylan4 2001-03-22 13:22:01: H2 flow problem Message-ID: controller return from vendor. I checked out gas flows and zeroed the mfc's the tube is ready for testing. From seymour at snf.stanford.edu Tue Jan 22 01:32:06 2002 From: seymour at snf.stanford.edu (seymour at snf.stanford.edu) Date: Jan 22, 2002 1:32:06 PM Subject: Shutdown tylan4 2002-01-22 13:32:05: needs testing after repair Message-ID: From seymour at snf.stanford.edu Mon Jan 28 03:42:38 2002 From: seymour at snf.stanford.edu (seymour at snf.stanford.edu) Date: Jan 28, 2002 3:42:38 PM Subject: Shutdown tylan4 2002-01-22 13:32:05: needs testing after repair Message-ID: the test came out good. the tube is up