From rcrane at snf.stanford.edu Mon Mar 10 17:33:08 2003 From: rcrane at snf.stanford.edu (Dick Crane) Date: Mon, 10 Mar 2003 17:33:08 -0800 Subject: HEPA air shutdown tylan1-4, wbgaas, AG4108 Message-ID: <3E6D3CD4.DF4338E4@snf.stanford.edu> Tylan1-4, wbgaas and ag4108 users, HEPA air to tylan, bank 1 furnaces (tylan1-4), wbgaas and the ag4108 will interrupted on Tuesday, March 18, from 7:00am to 2:00pm. Facilities will be installing a new variable speed drive controller for the transfer fan which supplies this area. HEPA air flow will be reduced to make-up air flow only (about 10-20% of normal flow). The wet bench exhaust flow will not be affected by this action. Users with a high sensitivity to particle contamination are advised to not load or unload furnaces during the shutdown time. Thanks for your help and patience, Dick