Shutdown tylan5 SNF 2007-07-06 09:22:36: Tube Pull

seymour at seymour at
Wed Jul 11 08:40:00 PDT 2007

Pull and cleean completed by mike . I replaced all the valves in the BBR3 delivery line. checked all gas flows on the mono block and adjusted zeros where required. checked flows to setpoint on the Tycom terminal. checked for leaks in the BBR3 lines. System needs coat/test after clean.