Problem tylanbpsg SNF 2004-08-05 12:44:15: Low Dep Rate

pethe at pethe at
Thu Aug 5 12:44:16 PDT 2004

Ran a Test Run on the LTO to check for dep rate. The dep rate is significantly reduced. I have listed the process parameters during the run.
	Test Run LTO400 08/05/2004
Expected Thickness: 4000A
Measured Thickness: 1100A
Base Pressure:16.1mT	Leak Pressure:49mT
Deposition Step:
SiH4 Flow Rate: 155 sccm (Expected 155)
O2 Flow Rate: 137 sccm (Expected 136)

More information about the tylanbpsg-pcs mailing list