Problem tylanbpsg SNF 2010-11-23 23:16:48: Failed the leak check at step 45

seymour at snf.stanford.edu seymour at snf.stanford.edu
Wed Nov 24 08:18:16 PST 2010


vented tube and opened. cleaned flakes off the door seal. Pumped in manual to a base pressure of 2 mT. Rate of rise was 14 mT/min