BPSG will be down tonight.
The leak rate on the tube put in yesterday was not good. Ray had to
pull the tube and readjust the fittings.
Tube is in. It is leaktight. Tomorrow it will be heated up and leak
checked.
On 9/27/2010 4:46 PM, maurice stevens wrote:
> BPSG will be down tonight...but tomorrow is looking good.
>
> Ray has the tube in and it is up to temperate. He will check the leak
> rate on it tomorrow, coat it if the leak rate is good and then throw
> it to me for a test.
>
> If all goes smoothly, the tube could be up after lunch.
>
> -m
>
>
--