Shutdown tylannitride 2002-06-04 11:26:56: Needs test after DCS MFC change
latta at snf.stanford.edu
latta at snf.stanford.edu
Wed Jun 5 04:43:07 PDT 2002
Results from ellipsometry and stress testing of LS Nirtride
after DCS MFC change out are:
Ellisometer
Wafer 1 Wafer 10
C 5034 C 4847
T 5093 T 4943
R 5115 R 4917
B 5098 B 4961
L 5100 RI 2.38 B4962 RI 2.38
Stress wafer1 = 116.33
Stress wafer 10 = 93.45
Thanks to Uli and Gladys for measurements.