Shutdown tylannitride 2002-03-19 06:30:55: Gas line redo
tberg at snf.stanford.edu
tberg at snf.stanford.edu
Tue Mar 19 03:01:21 PST 2002
Previous message:
Shutdown tylannitride 2002-03-19 06:30:55: Gas line redo
Next message:
Problem tylannitride 2002-03-21 09:07:09: 3/21: metal and nonmetal vacuum wands switched when I came to use tylannitride this morning. I have no idea when they were switched and/or if the tubes are contaminated. Dummies are now gone too since
Messages sorted by:
[ date ]
[ thread ]
[ subject ]
[ author ]
Gas line work completed
Previous message:
Shutdown tylannitride 2002-03-19 06:30:55: Gas line redo
Next message:
Problem tylannitride 2002-03-21 09:07:09: 3/21: metal and nonmetal vacuum wands switched when I came to use tylannitride this morning. I have no idea when they were switched and/or if the tubes are contaminated. Dummies are now gone too since
Messages sorted by:
[ date ]
[ thread ]
[ subject ]
[ author ]
More information about the tylannitride-pcs mailing list