From amyers at snf.stanford.edu Tue May 4 14:41:03 2004 From: amyers at snf.stanford.edu (amyers at snf.stanford.edu) Date: Tue, 4 May 2004 14:41:03 -0700 Subject: Shutdown tylannitride 2004-05-04 14:41:02: slow pump valve replacement Message-ID: From mdickey at snf.stanford.edu Tue May 4 14:46:48 2004 From: mdickey at snf.stanford.edu (mdickey at snf.stanford.edu) Date: Tue, 4 May 2004 14:46:48 -0700 Subject: Shutdown tylannitride 2004-05-04 14:41:02: slow pump valve replacement Message-ID: replaced slow pump valve...ready for use From tberg at snf.stanford.edu Thu May 6 06:31:11 2004 From: tberg at snf.stanford.edu (tberg at snf.stanford.edu) Date: Thu, 6 May 2004 06:31:11 -0700 Subject: Shutdown tylannitride 2004-05-06 06:31:10: Pull and clean Message-ID: Down for routine pull and clean From tberg at snf.stanford.edu Thu May 6 06:31:45 2004 From: tberg at snf.stanford.edu (tberg at snf.stanford.edu) Date: Thu, 6 May 2004 06:31:45 -0700 Subject: Comment tylannitride 2004-04-30 14:15:15: LONH378 test Message-ID: test results noted From mdickey at snf.stanford.edu Thu May 6 14:26:20 2004 From: mdickey at snf.stanford.edu (mdickey at snf.stanford.edu) Date: Thu, 6 May 2004 14:26:20 -0700 Subject: Comment tylannitride 2004-05-06 14:26:16: In coat Message-ID: Pull and clean is done. TUbe is currently in coat recipe From maurice at snf.stanford.edu Fri May 7 14:04:19 2004 From: maurice at snf.stanford.edu (maurice at snf.stanford.edu) Date: Fri, 7 May 2004 14:04:19 -0700 Subject: Comment tylannitride 2004-05-06 14:26:16: In coat Message-ID: coated, tested. LONH378 some partiles. more toward the front on the tube. uniformity good From maurice at snf.stanford.edu Fri May 7 14:04:37 2004 From: maurice at snf.stanford.edu (maurice at snf.stanford.edu) Date: Fri, 7 May 2004 14:04:37 -0700 Subject: Shutdown tylannitride 2004-05-06 06:31:10: Pull and clean Message-ID: logged From ychliu at snf.stanford.edu Sun May 16 10:59:52 2004 From: ychliu at snf.stanford.edu (ychliu at snf.stanford.edu) Date: Sun, 16 May 2004 10:59:52 -0700 Subject: Shutdown tylannitride 2004-05-16 10:59:51: burnbox alarm Message-ID: From tberg at snf.stanford.edu Mon May 17 07:38:26 2004 From: tberg at snf.stanford.edu (tberg at snf.stanford.edu) Date: Mon, 17 May 2004 07:38:26 -0700 Subject: Shutdown tylannitride 2004-05-16 10:59:51: burnbox alarm Message-ID: replaced OT switch and cleaned-OK now From vossough at snf.stanford.edu Tue May 18 01:04:30 2004 From: vossough at snf.stanford.edu (vossough at snf.stanford.edu) Date: Tue, 18 May 2004 01:04:30 -0700 Subject: Shutdown tylannitride 2004-05-18 01:04:30: can not open tube Message-ID: pressed "alarm ack" twice and waited more than 30 min. Tube pressure would not go above 550 torr. From seymour at snf.stanford.edu Tue May 18 09:13:06 2004 From: seymour at snf.stanford.edu (seymour at snf.stanford.edu) Date: Tue, 18 May 2004 09:13:06 -0700 Subject: Shutdown tylannitride 2004-05-18 01:04:30: can not open tube Message-ID: Replaced slopump valve with a rebuilt and tested one. Rewrapped the heater and tested system. Base was 8 mT and ROR was 5mT/mT/ . After ROR I vented tube with normal purge flow and it opened in about 10 mins. Tube it up for use.