Shutdown tylannitride SNF 2008-08-21 10:15:41: Leak rate

mdickey at mdickey at
Thu Aug 21 10:57:39 PDT 2008

Tightened up ultra torre connection to the tube. Currently 
running a test. Base was at 13 m.t. and rate of rise was
10 m.t. before test. Running a program for testing.

More information about the tylannitride-pcs mailing list