From tberg at snf.stanford.edu Wed Nov 7 07:08:16 2001 From: tberg at snf.stanford.edu (tberg at snf.stanford.edu) Date: Nov 7, 2001 7:08:16 AM Subject: Shutdown tylanpoly 2001-11-07 07:08:14: Abort for SiH4-cylinder Change Message-ID: Sih4 ran out during Dep. System down for pull and clean From seymour at snf.stanford.edu Thu Nov 8 07:18:43 2001 From: seymour at snf.stanford.edu (seymour at snf.stanford.edu) Date: Nov 8, 2001 7:18:43 AM Subject: Shutdown tylanpoly 2001-11-07 07:08:14: Abort for SiH4-cylinder Change Message-ID: the silane cylinder has been changed and the leak check passed. From seymour at snf.stanford.edu Thu Nov 8 07:19:44 2001 From: seymour at snf.stanford.edu (seymour at snf.stanford.edu) Date: Nov 8, 2001 7:19:44 AM Subject: Shutdown tylanpoly 2001-11-08 07:19:42: needs test after pull and clean Message-ID: From seymour at snf.stanford.edu Fri Nov 9 02:25:07 2001 From: seymour at snf.stanford.edu (seymour at snf.stanford.edu) Date: Nov 9, 2001 2:25:07 PM Subject: Shutdown tylanpoly 2001-11-08 07:19:42: needs test after pull and clean Message-ID: system is up to run From mcvittie at snf.stanford.edu Tue Nov 20 04:55:18 2001 From: mcvittie at snf.stanford.edu (mcvittie at snf.stanford.edu) Date: Nov 20, 2001 4:55:18 PM Subject: Shutdown tylanpoly 2001-11-20 16:55:17: Silane Line Shut Message-ID: The Silane has been shut for purging and leak testing. It will be back up tomorrow (wed) evening. Jim From mcvittie at snf.stanford.edu Tue Nov 20 07:27:59 2001 From: mcvittie at snf.stanford.edu (mcvittie at snf.stanford.edu) Date: Nov 20, 2001 7:27:59 PM Subject: Shutdown tylanpoly 2001-11-20 16:55:17: Silane Line up Message-ID: Could not get Tystar to purge silane line in manual mode. Have delayed work on silane for now. Jim