system status

Ray Seymour seymour at snf.stanford.edu
Tue Feb 13 08:31:23 PST 2001


found leak at gas ring. repaired leak and rebuilt loader. check system
operation and it checks ok. Tube is now being coated by Jaime, it will
then be released to production.




More information about the tylanpoly mailing list