Problem tylansige SNF 2010-07-19 20:06:15: No Dep

chienyuc at chienyuc at
Mon Jul 19 20:06:16 PDT 2010

Running CHION and the gas flow were all checked normal, and the Ge dep time was 20 minute.  Measured with woolam and found no deposition (less than 1A).  

More information about the tylansige-pcs mailing list