From seymour at snf.stanford.edu Mon Nov 5 08:13:19 2001 From: seymour at snf.stanford.edu (Ray Seymour) Date: Mon, 05 Nov 2001 08:13:19 -0800 Subject: silane cylinder change Message-ID: <3BE6BA9F.5378448E@snf.stanford.edu> I will be changing the silane cylinder on the above tool on Thursday Nov. 8. This will require a 24 hour leak check so the tubes will be down till Friday morning if all goes well. From seymour at snf.stanford.edu Mon Nov 12 13:57:31 2001 From: seymour at snf.stanford.edu (Ray Seymour) Date: Mon, 12 Nov 2001 13:57:31 -0800 Subject: burnbox cleans Message-ID: <3BF045CB.5BF09F81@snf.stanford.edu> I have had to clean the burnbox three times in the last eight days. This is primarily due to the increased usage of tylannitride low stress nitride. Prior to the last few weeks the box required cleaning every two weeks with a few exceptions. During the times of lower usage I would schedule the clean for every other Monday morning from 6 am till about 9 am to allow cooling down and the clean. These faster coming cleans do not allow me to schedule the clean and this requires the shutting down of the above tool with little to no notice. I am sorry for the inconvenience this will cause. We are looking into the nitride process and equipment to see if we can slow down the burnbox getting clogged and needing a clean. Ray Seymour 47425