From rohits at stanford.edu Thu Sep 20 15:12:16 2001 From: rohits at stanford.edu (Rohit Shenoy) Date: Thu, 20 Sep 2001 15:12:16 -0700 Subject: [Fwd: germaine] Message-ID: <3BAA69C0.3190C8F4@stanford.edu> The tylansige tube will be down for Germane bottle change. Ray Seymour wrote: > > Hi Rohit, > The Gremaine is at about 17 lbs of product left in the cylinder and is > in need of changing. My email system is down at mydesk and you are the > only user I can remember to send out this message. Would you please > notify everyone that the cylinder is up for a change and unless some > o9ne wants to do a run of medium lenght it should be done now. I will > wait for an answer before I start. > Thank you > Ray > PS there will be a 24 hour leak check after the cylinder change From seymour at snf.stanford.EDU Thu Sep 20 16:20:02 2001 From: seymour at snf.stanford.EDU (Ray Seymour) Date: Thu, 20 Sep 2001 16:20:02 -0700 Subject: Ge cylinder change Message-ID: <3BAA79A2.9724CBD3@snf.stanford.EDU> the Ge cylinder has been changed and is now under leak check until tomorrow From mdickey at snf.stanford.edu Fri Sep 21 14:35:00 2001 From: mdickey at snf.stanford.edu (Mike Dickey) Date: Fri, 21 Sep 2001 14:35:00 -0700 Subject: Germane change Message-ID: <3BABB283.550104E@snf.stanford.edu> Germane cylinder changed, system passed leak check, system is up From seymour at snf.stanford.edu Mon Sep 24 11:41:29 2001 From: seymour at snf.stanford.edu (ray seymour) Date: Mon, 24 Sep 2001 11:41:29 -0700 Subject: furnace status Message-ID: <3BAF7E59.9DC529EB@snf.stanford.edu> The status of the furnace at this time. I have all the standard quartz ware needed to put the tube together again. I have a used element that need to be checked out and installed if determined to be good. I have contacted the furnace vender to get me part numbers for the parts needed . I am ordering shorter loader quartz rods as per Jim McVittie. When I know the estimated time of the tube being up I will send out message. Any questions please contact me Ray 4-7425