HEPA air shutdown tylan1-4, wbgaas, AG4108
Dick Crane
rcrane at snf.stanford.edu
Tue Mar 11 13:19:07 PST 2003
Tylan1-4, wbgaas and ag4108 users,
HEPA air to tylan, bank 1 furnaces (tylan1-4), wbgaas and the ag4108
will interrupted on Tuesday, March 18, from 7:00am to 2:00pm. Facilities
will be installing a new variable speed drive controller for the
transfer fan which supplies this area. HEPA air flow will be reduced to
make-up air flow only (about 10-20% of normal flow). The wet bench
exhaust flow will not be affected by this action. Users with a high
sensitivity to particle contamination are advised to not load or unload
furnaces during the shutdown time.
Thanks for your help and patience,
Dick
More information about the wbgaas-hpl
mailing list