From jhaydon at snf.stanford.edu Mon Dec 2 08:48:02 2002 From: jhaydon at snf.stanford.edu (jhaydon at snf.stanford.edu) Date: Dec 2, 2002 8:48:02 AM Subject: Shutdown wbgen-hpl 2002-12-02 08:48:01: power distribution problem Message-ID: From jhaydon at snf.stanford.edu Mon Dec 2 11:30:34 2002 From: jhaydon at snf.stanford.edu (jhaydon at snf.stanford.edu) Date: Dec 2, 2002 11:30:34 AM Subject: Shutdown wbgen-hpl 2002-12-02 08:48:01: power distribution problem Message-ID: replaced bad wiring From beckwith at snf.stanford.edu Thu Dec 19 11:13:25 2002 From: beckwith at snf.stanford.edu (beckwith at snf.stanford.edu) Date: Dec 19, 2002 11:13:25 AM Subject: Problem wbgen-hpl 2002-12-19 11:13:24: plenum flush does not work...no water Message-ID: