From jhaydon at snf.stanford.edu Wed May 2 14:58:19 2012 From: jhaydon at snf.stanford.edu (jhaydon at snf.stanford.edu) Date: Wed, 2 May 2012 14:58:19 -0700 Subject: Shutdown wbmetal SNF 2012-05-02 14:58:19: repacing oring in SRD Message-ID: From jhaydon at snf.stanford.edu Thu May 3 07:05:24 2012 From: jhaydon at snf.stanford.edu (jhaydon at snf.stanford.edu) Date: Thu, 3 May 2012 07:05:24 -0700 Subject: Shutdown wbmetal SNF 2012-05-02 14:58:19: repacing oring in SRD Message-ID: o-ring replaced From jhaydon at snf.stanford.edu Mon May 14 13:32:23 2012 From: jhaydon at snf.stanford.edu (jhaydon at snf.stanford.edu) Date: Mon, 14 May 2012 13:32:23 -0700 Subject: Problem wbmetal SNF 2012-04-24 10:46:45: Al etchant liquid level senser unstable Message-ID: ran twenty minute test with no faults From jasonlin at snf.stanford.edu Tue May 15 11:25:55 2012 From: jasonlin at snf.stanford.edu (jasonlin at snf.stanford.edu) Date: Tue, 15 May 2012 11:25:55 -0700 Subject: Problem wbmetal SNF 2012-05-15 11:25:55: Not drying Message-ID: SRD not drying wafers completely From uli at snf.stanford.edu Thu May 17 15:39:00 2012 From: uli at snf.stanford.edu (uli at snf.stanford.edu) Date: Thu, 17 May 2012 15:39:00 -0700 Subject: Problem wbmetal SNF 2012-05-15 11:25:55: Not drying Message-ID: User ran program A instead of number 1.