From latta at snf.stanford.edu Mon Sep 17 10:59:44 2001 From: latta at snf.stanford.edu (latta at snf.stanford.edu) Date: Sep 17, 2001 10:59:44 AM Subject: Shutdown wbnitride 2001-08-24 11:11:35: DI dripper off Message-ID: Dripper being tested by staff and a user. From latta at snf.stanford.edu Mon Sep 17 10:59:57 2001 From: latta at snf.stanford.edu (latta at snf.stanford.edu) Date: Sep 17, 2001 10:59:57 AM Subject: Problem wbnitride 2001-08-08 14:06:26: Several problems w/ nitride etch bath... Message-ID: All problem resolved... From cmfaulkn at snf.stanford.edu Fri Sep 21 08:12:37 2001 From: cmfaulkn at snf.stanford.edu (cmfaulkn at snf.stanford.edu) Date: Sep 21, 2001 8:12:37 PM Subject: Problem wbnitride 2001-09-21 20:12:36: quick dump not operational Message-ID: From cmfaulkn at snf.stanford.edu Fri Sep 21 08:14:23 2001 From: cmfaulkn at snf.stanford.edu (cmfaulkn at snf.stanford.edu) Date: Sep 21, 2001 8:14:23 PM Subject: Problem wbnitride 2001-09-21 20:14:22: Poor control on phosphoric bath Message-ID: The phosphoric bath temperature keeps going high and into HOLD. The DI drip is turning on, but apparently not nearly enough. From booth at snf.stanford.edu Tue Sep 25 06:54:28 2001 From: booth at snf.stanford.edu (booth at snf.stanford.edu) Date: Sep 25, 2001 6:54:28 AM Subject: Problem wbnitride 2001-09-21 20:12:36: quick dump not operational Message-ID: Fuses in 24vac supply transformer for QDR controller were wrong size & blew. Replaced fuses with correct size, turned on pneu. air supply, & its working fine again.